Industries

Oil and gas Optimise production, from well to export.

Cerno connects control, metering, well, integrity and laboratory systems, and helps teams raise production, cut flaring and fuel, and keep assets safe.

Book a demo

01How it works

Sees what no single system can.

Cerno screen: how it works, sees what no single system can
  1. AConnects well, process, metering and maintenance systems, without replacing any of them.
  2. BSpots the pattern behind deferred production or rising flaring before it escalates, with the evidence and the cost.
  3. CActs on it by proposing the fix, preparing the work for permit once approved and checking output recovered.

02Production

Close the gap to forecast.

Cerno screen: production, close the gap to forecast
  1. AWell performance Finds underperformers early, while output can be recovered.
  2. BAllocation Reconciles volumes from well to export.
  3. CDeferment Reduces production lost to trips and constraints.

03Energy and emissions

Cut flaring and fuel.

Cerno screen: energy and emissions, cut flaring and fuel
  1. AFlaring Finds what sends gas to the flare.
  2. BFuel gas Finds waste across compressors and turbines.
  3. CEmissions reporting Drafts submissions from the same records.

04Integrity

Keep the plant safe and running.

Cerno screen: integrity, keep the plant safe and running
  1. ARotating equipment Flags compressor and pump faults before they stop production.
  2. BCorrosion Tracks wall loss across lines and vessels.
  3. CSafety device tests Flags overdue and failed checks.

05Turnarounds and permits

Arrive at each turnaround ready.

Cerno screen: turnarounds and permits, arrive at each turnaround ready
  1. ATurnaround scope Builds the work list from what the data shows.
  2. BPermits Lists the isolations each job needs.
  3. CContractor work Checks completed jobs against the data.

Built around how the site runs.

  • Turnarounds set the calendarEach finding is weighed against the next turnaround, and work is held or brought forward.
  • Work runs under permitRecommended work states the isolations required, ready for the permit to work.
  • Access is limitedOffshore and hazardous area visits are planned in full before anyone travels.

Connected to the systems already in use.

  • Control systems
    EmersonHoneywellYokogawaABB
  • Historians
    AVEVA PIHoneywell
  • Maintenance systems
    SAPIBM
  • Inspection records
  • Laboratory systems
    Thermo Fisher ScientificLabWare
  • Shift logs

Read only. Products shown are examples; their names and logos belong to their owners.

Manufacturing

Common questions

Does this replace the permit to work system?

No. Permits stay in the existing system. Recommended work states what the permit needs.

Does this touch control or protection systems?

No. Cerno reads them and never writes to them. An approved work order is the only thing it sends to another system.

What is required to begin?

The systems you already run. Cerno starts with what is available and adds sources over time.

See Cerno at work on an operation like yours.