Industries

Electricity Cut losses and keep supply on.

Cerno connects SCADA, metering, billing, asset and field systems, and helps utilities reduce losses, protect supply quality and plan outages and crews.

Book a demo

01How it works

Sees what no single system can.

Cerno screen: how it works, sees what no single system can
  1. AConnects control, metering, billing and asset records, without replacing any of them.
  2. BSpots the pattern behind lost revenue or a failing asset before it escalates, with the evidence and the cost.
  3. CActs on it by proposing the fix, sending the crew once approved and checking the losses came down.

02Losses and revenue

Account for every unit.

Cerno screen: losses and revenue, account for every unit
  1. ATechnical losses Finds where feeders and transformers waste energy.
  2. BCommercial losses Finds energy that is used but not billed.
  3. CMeter health Finds faulty and tampered units before they cost revenue.

03Quality of supply

Keep supply reliable.

Cerno screen: quality of supply, keep supply reliable
  1. AVoltage Finds where supply drifts out of limits.
  2. BInterruptions Finds the shared cause behind repeat faults.
  3. CNetwork capacity Plans for load growth and new connections.

04Assets

Extend the life of every asset.

Cerno screen: assets, extend the life of every asset
  1. ATransformer condition Flags units heading for failure, from oil, load and temperature.
  2. BSwitchgear and cable condition Spots wear between inspections.
  3. CReplacement planning Ranks assets by risk, so budget goes where it matters.

05Outages and crews

Plan once, report once.

Cerno screen: outages and crews, plan once, report once
  1. AOutage planning Groups work into fewer shutdowns.
  2. BCrew dispatch Sends each team out with the task, parts and history.
  3. CRegulatory reporting Drafts returns from the same records.

Built around how the site runs.

  • Assets age out of sightOil results, load history and inspections are read as one picture of condition.
  • Outage windows are scarceFindings are timed to the next planned outage, not a calendar interval.
  • Replacements take monthsEarly warning leaves time to order a transformer before it fails.

Connected to the systems already in use.

  • SCADA
    SiemensSchneider ElectricGE VernovaHitachi
  • Historians
    AVEVA PI
  • Asset management
    SAPIBMOracle
  • Oil laboratories
  • Metering systems
    Landis+GyrItron
  • Field reports

Read only. Products shown are examples; their names and logos belong to their owners.

Oil and gas

Common questions

Does this change protection settings?

No. Protection systems and their settings stay with the engineers responsible for them.

Does this touch control or protection systems?

No. Cerno reads them and never writes to them. An approved work order is the only thing it sends to another system.

What is required to begin?

The systems you already run. Cerno starts with what is available and adds sources over time.

See Cerno at work on an operation like yours.